当前位置: 首页> 英语素材> 正文

介绍水立方的英语作文_专业高分英语作文3篇

  • 作者: 用户投稿
  • 2023-04-19 07:58:14
  • 26

介绍水立方的英语作文_专业高分英语作文3篇

关于”介绍水立方“的英语作文模板3篇,作文题目:Introduction to water cube。以下是关于介绍水立方的专业英语模板,每篇作文均为高分模板带翻译。

高分英语作文1:Introduction to water cube

Known as the "Water Cube", the national water sports center will be one of the most eye-catching and exciting venues for the Beijing Olympic Games. In July, the PTW consortium of Arup also left a deep impression on the people. The international design competition of the National Swimming Center for the Beijing Olympic Games is composed of international architects, engineers and outstanding Chinese scholars, and is jointly evaluated by CSCEC, CSCEC Shenzhen Design Institute (CSCEC) and CSCEC Shenzhen Design Institute (CSCEC + Design Institute) The election starts with the materials submitted by ten international consortia, including a public exhibition and voting.

The water cube appears to be ready in October, with both concrete and steel structures completed. In April, the prototype m? 2 cladding was installed. The next stage is to install all cladding, and then continue to dismantle the internal structure to complete the internal structure.

The structural design of buildings is based on the natural formation of soap bubbles to achieve the structural design of buildings. This is based on the natural formation of soap bubbles, giving random, organic appearance. We used the research conducted by weaire and Phelan (physics professor) to study how to arrange soap bubbles into infinite arrays to make the design vivid, and the single bubble is integrated into a plastic film And cut it like a sewing pattern.

The whole part is spliced together and then placed in the structure. There are internal and external membranes. The membrane will continue to be pumped after it is inflated on site.

The actual pumping has been contracted out. Once the installation is completed, the operator will be responsible for the operation and maintenance of the facade for 10 years. This is the project introduction and the choice of the contractor, which provides us with an opportunity to provide expertise in sustainable services Knowledge.

The building will use solar energy to heat the pool and interior area, and all backwash water will be filtered and returned to the pool. The scheme and design of the project was developed in Australia. Now, the project has been handed over to a construction team in Beijing.

中文翻译:

被称为“水立方”的国家水上运动中心将是北京奥运会最引人注目、最激动人心的场馆之一。xx月,奥雅纳建筑公司PTW的联合体也给人们留下了深刻的印象,北京奥运会国家游泳中心国际设计竞赛由国际建筑师、工程师和中国杰出学者组成,中国建筑股份有限公司、中国建筑深圳设计院(中国建筑工程总公司)和中建深圳设计院(中国建筑+设计院)联合评选,从十个国际财团提交的材料开始,还包括一个公开展览和投票。水立方看起来将于xx月准备就绪,混凝土和钢结构均已完成,xx月份安装了m²的原型覆层,下一个阶段是安装所有的包层,然后继续拆除内部结构,完成内部结构。

建筑的结构设计是基于肥皂泡的自然形成来达到建筑的结构设计,这是基于肥皂泡的自然形成给予随机的,有机外观,我们使用了由Weaire和Phelan(物理教授)进行的研究,研究如何将肥皂泡排列成无限的阵列,使设计变得生动起来,单个气泡被整合到一个塑料薄膜中,并像缝纫图案一样进行裁剪。整个部分被拼接在一起,然后放置在结构有内部和外部薄膜,薄膜在现场充气后将继续泵送,实际泵送已分包出去,一旦安装完成,操作员将负责立面运行和维护xx年,这是项目简介和承包商的选择为我们提供了一个机会,使我们能够提供可持续服务方面的专业知识。建筑将使用太阳能来加热水池和内部区域,所有的反冲洗水都要经过过滤并返回到游泳池。

该项目的方案和设计是在澳大利亚制定的。现在,该项目已移交给北京的一个负责施工的小组。

万能作文模板2:水立方简介

Known as the "Water Cube", the national water sports center will be one of the most eye-catching and exciting venues for the Beijing Olympic Games. In July, the PTW consortium of Arup also left a deep impression on the people. The international design competition of the National Swimming Center for the Beijing Olympic Games is composed of international architects, engineers and outstanding Chinese scholars, and is jointly evaluated by CSCEC, CSCEC Shenzhen Design Institute (CSCEC) and CSCEC Shenzhen Design Institute (CSCEC + Design Institute) The election starts with the materials submitted by ten international consortia, including a public exhibition and voting.

The water cube appears to be ready in October, with both concrete and steel structures completed. In April, the prototype m? 2 cladding was installed. The next stage is to install all cladding, and then continue to dismantle the internal structure to complete the internal structure.

The structural design of buildings is based on the natural formation of soap bubbles to achieve the structural design of buildings. This is based on the natural formation of soap bubbles, giving random, organic appearance. We used the research conducted by weaire and Phelan (physics professor) to study how to arrange soap bubbles into infinite arrays to make the design vivid, and the single bubble is integrated into a plastic film And cut it like a sewing pattern.

The whole part is spliced together and then placed in the structure. There are internal and external membranes. The membrane will continue to be pumped after it is inflated on site.

The actual pumping has been contracted out. Once the installation is completed, the operator will be responsible for the operation and maintenance of the facade for 10 years. This is the project introduction and the choice of the contractor, which provides us with an opportunity to provide expertise in sustainable services Knowledge.

The building will use solar energy to heat the pool and internal areas, and all backwash water will be filtered and returned to the pool. The scheme and design of the project was developed in Australia. The project has now been handed over to a team in Beijing, which is responsible for the construction of "PTW + supporting wearphelan".

中文翻译:

被称为“水立方”的国家水上运动中心将是北京奥运会最引人注目、最激动人心的场馆之一。xx月,奥雅纳建筑公司PTW的联合体也给人们留下了深刻的印象,北京奥运会国家游泳中心国际设计竞赛由国际建筑师、工程师和中国杰出学者组成,中国建筑股份有限公司、中国建筑深圳设计院(中国建筑工程总公司)和中建深圳设计院(中国建筑+设计院)联合评选,从十个国际财团提交的材料开始,还包括一个公开展览和投票。水立方看起来将于xx月准备就绪,混凝土和钢结构均已完成,xx月份安装了m²的原型覆层,下一个阶段是安装所有的包层,然后继续拆除内部结构,完成内部结构。

建筑的结构设计是基于肥皂泡的自然形成来达到建筑的结构设计,这是基于肥皂泡的自然形成给予随机的,有机外观,我们使用了由Weaire和Phelan(物理教授)进行的研究,研究如何将肥皂泡排列成无限的阵列,使设计变得生动起来,单个气泡被整合到一个塑料薄膜中,并像缝纫图案一样进行裁剪。整个部分被拼接在一起,然后放置在结构有内部和外部薄膜,薄膜在现场充气后将继续泵送,实际泵送已分包出去,一旦安装完成,操作员将负责立面运行和维护xx年,这是项目简介和承包商的选择为我们提供了一个机会,使我们能够提供可持续服务方面的专业知识。建筑将使用太阳能来加热水池和内部区域,所有的反冲洗水将被过滤并返回游泳池。

该项目的方案和设计是在澳大利亚制定的。该项目现已移交给北京的一个团队,该团队负责施工“ptw+支撑Weairphelan”。

满分英语范文3:介绍水立方

Water cube [H2O] m × m × m National Swimming Center is called water cube (located in Beijing Olympic Park, it is the main natatorium built in Beijing during the summer Olympic Games, and also one of the landmark buildings of Beijing Olympic Games. After the global design competition, the water cube scheme will be put into operation in December, and it will be built in January (called the bird's Nest) and the National Stadium in Beijing On both sides of the city axis, a relatively complete historical city image of Beijing is formed. The planned construction land of the National Swimming Center is square meters, with a total construction area of square meters.

The floor area of the underground part is mostly square meters, and the height is meters. At present, RMB and local RMB have been donated from Hong Kong and overseas compatriots, Zheng Yutong, Zheng Jiachun and their subordinate enterprises..

中文翻译:

水立方[H2O]m×m×m国家游泳中心称为水立方(水立方位于北京奥林匹克公园,是北京在夏季奥运会建设的主要游泳馆,也是北京奥运会标志性建筑之一其设计方案,经过全球设计竞赛后有水立方方案xx月,运营,xx月建成它(名为鸟巢)与国家体育场在回顾北京市最北端城市轴线两侧,共同形成较为完整的北京历史城市形象国家游泳中心规划建设用地平方米,总建筑面积平方米,地下部分的楼面面积多在平方米,长高分别为米米,目前已从香港和海外同胞和郑宇通、郑佳春父子和下属企业共捐出了人民币和当地的人民币。

  • 3457人参与,13条评论